ICU Medical Clean Room

Addition

  • Owner:
    ICU Medical, Inc.
  • Location:
    Salt Lake City, UT
  • Size:
    82,500 sq. ft.
  • Approach:
    Design/Build
  • Scope:
    HVAC, Plumbing, Piping, Process Piping, BIM, Temperature Controls

Harris Mechanical Intermountain provided complete mechanical services for the Clean Room addition at the ICU Medical’s Salt Lake City manufacturing facility. Harris was able to use an innovative waterside economizer with bypass cooling coils to reach higher efficiencies which helped provide ICU Medical with an incentive for the design.

The clean room addition was built on an aggressive schedule. BIM, prefabrication and coordination with the other trades on site helped Harris complete the project on time. As this was a facility in the healthcare industry, special care was taken in the construction to help keep the clean room clean.