ICU Medical Clean Room

Addition

  • Owner:
    ICU Medical, Inc.
  • Location:
    Salt Lake City, UT
  • Size:
    82,500 sq. ft.
  • Approach:
    Design/Build
  • Scope:
    HVAC, Plumbing, Piping, Process Piping, BIM, Temperature Controls

Harris Mechanical Intermountain provided complete mechanical services for the Clean Room addition at ICU Medical’s Salt Lake City manufacturing facility which produces plastic parts for medical products.

Working on an aggressive schedule, Harris coordinated with it’s project partners to efficiently install all ductwork and pipe to keep the project on track and running smoothly.

As the Design/Build contractor Harris was able to use an innovative water side economizer with bypass cooling coil to reach higher efficiency and help in providing ICU Medical with an incentive for the design.