Terra Verde Corporate Campus Phase I

Harris completed the HVAC scope for the construction of the Terra Verde Corporate Campus. The new high-end office project located in the north corridor of Scottsdale, consists of four buildings.

For the first phase of the project, Harris provided complete HVAC systems that included installing two rooftop fluid coolers, three condenser water pumps, shell water source heat pump systems, as well as all piping, ductwork and direct current controls. To decreases energy consumption, two energy recovery ventilators were installed to provide pre-cooling to the outside air systems utilizing the building’s general exhaust. Harris also provided a complete oxygen monitoring system for the parking garage located two floors below-grade which required 20 wall mounted exhaust fans running at 47,710 cubic feet per minute with variable frequency drives (VFDs).

Read more about Our expertise in:

See more projects
183,976
square feet
  • Location
    Scottsdale, AZ
  • Owner
    Desert Troon Companies
  • General Contractor
    DL Withers Construction LLC
  • Market
    Office
  • Expertise
    Construction, Design + Engineering, Manufacturing, Service
  • Delivery Method
    Plan + Spec
  • Scope
    Cost Estimating, HVAC, Insulation, Manufacturing, Temperature Controls, Test and Balance
  • Completion Date